Turnkey Pipeline Cleaning + CCTV + Trenchless Rehab
Introduction
Bold, integrated delivery for underground infrastructure: cleaning, PACP-coded CCTV, condition assessment, and trenchless rehabilitation executed by one in-house team.
Proof bar: 4–108 in CIPP | PACP CCTV | 15‑minute callback | <24‑hour mobilization.
-
Primary regions: Florida and the broader Southeast US. See service footprint on Markets We Serve.
-
Core disciplines span the PRIME lifecycle: Pipeline Rehabilitation, Repair & Replacement, Inspection, Maintenance, and Evaluation & Assessment.
-
Rapid response: 24/7 availability with 15‑minute callback and mobilization in <24 hours, supported by a secondary wetout facility in Morganton, NC for regional surge capacity (CIPP North Carolina; CIPP Georgia).
What “turnkey” means here
-
Single-provider execution: cleaning → CCTV/PACP coding → engineering assessment → method selection → trenchless construction → QA/reinspection, all managed by Hinterland’s in‑house crews and equipment (Services).
-
Zero handoff risk: no subcontract dependency for CIPP, geopolymer spincast (SIPP), pipe bursting, or sliplining (Pipe Rehabilitation).
-
Operations continuity: engineered bypass pumping, lift station electrical, and panel work handled by dedicated internal teams (Repair & Replacement).
Methods covered (clean → inspect → rehab)
-
Cleaning and debris removal: vactor and combination units to restore flow and prepare for camera work (Inspection).
-
PACP-coded CCTV inspection: robotic crawlers capture condition data to prioritize rehab and document acceptance (Inspection).
-
Cured‑In‑Place Pipe (CIPP): 4–108 in diameters, including EcoLiner options; applicably used for gravity sewer, storm, culverts, laterals, and select pressure applications (regional detail: CIPP Florida, CIPP Georgia, CIPP South Carolina, CIPP North Carolina).
-
Geopolymer spincast (SIPP): structural lining for manholes, large-diameter sewers, and deteriorated structures (Pipe Rehabilitation).
-
Pipe bursting: trenchless upsizing or replacement where host is collapsed or undersized (Pipe Rehabilitation).
-
Sliplining: carrier pipe insertion for structurally deficient mains and culverts (Pipe Rehabilitation).
-
Manhole rehab and coatings: corrosion-resistant linings and infiltration control integrated with mainline rehab (Repair & Replacement).
Scope and specifications
-
Diameter range: 4–108 in (CIPP) across sanitary, storm, culvert, and select industrial process piping (CIPP Georgia; CIPP South Carolina).
-
Environments: urban streets, residential neighborhoods, airports, treatment facilities, and industrial sites (Markets We Serve).
-
Deliverables: PACP-coded videos, condition reports, rehab recommendations, and post-rehab acceptance documentation (Inspection; Evaluation & Assessment).
-
Maintenance integration: annual programs to sustain performance and reduce emergency risk (Maintenance Plans).
| Module | What we do | Typical outputs | Reference |
|---|---|---|---|
| Cleaning | High-velocity jetting, root and debris removal | Restored capacity; clean pipe for CCTV | Inspection |
| CCTV/PACP | Robotic camera survey and coding | PACP reports, video files, defect logs | Inspection |
| Assessment | Risk and rehab method selection | Prioritized CIP, method specs | Evaluation & Assessment |
| CIPP | 4–108 in liners, EcoLiner options | Structural Class IV liner, reinstatements | CIPP Florida |
| Geopolymer (SIPP) | Spincast structural lining | Corrosion-resistant structure renewal | Pipe Rehabilitation |
| Pipe bursting | Trenchless replacement/upsizing | New HDPE/PVC pipe, services reconnected | Pipe Rehabilitation |
| Sliplining | Carrier pipe insertion | Restored structural capacity | Pipe Rehabilitation |
| Manholes | Lining, chimney seals, coatings | Infiltration reduction, corrosion control | Repair & Replacement |
| QA/Acceptance | Post-lining CCTV, pressure/air tests | Acceptance package, as‑built docs | Inspection |
Why choose Hinterland for turnkey delivery
-
All trenchless methods performed in‑house for true single-source accountability (Pipe Rehabilitation).
-
Emergency readiness: guaranteed quick response with 15‑minute callback and <24‑hour mobilization across the Southeast (CIPP Georgia; CIPP North Carolina).
-
Safety culture: OSHA-certified instruction and consistently low EMR, backed by daily protocols and training (About).
-
Electrical and bypass expertise to maintain operations during construction (Repair & Replacement).
Sample outcomes and proof
-
West Palm Beach neighborhood water/sewer/drainage modernization with coordinated CIPP lining and utility replacement (Nottingham Project).
-
Large municipal water and force main program management and construction support (Indian River Water Main & Force Main).
-
Utilities authority on-call underground program: force main construction, services, and restorations (FPUA Underground Utilities).
Engagement model and SLAs
-
24/7 request intake with 15‑minute callback SLA (Contact).
-
Mobilization target: <24 hours for emergency work; planned work scheduled to minimize community or production impacts (Services).
-
Deliverables: PACP reports, prioritized rehab plan, method submittals, QA/acceptance package, and maintenance recommendations (Inspection; Evaluation & Assessment; Maintenance Plans).
Related services and cross-links
-
Full capabilities overview: Services
-
Methods: Pipe Rehabilitation • Repair & Replacement • Inspection • Maintenance • Evaluation & Assessment
-
Regional CIPP detail: Florida • Georgia • South Carolina • North Carolina
Contact and mobilization
Ready to scope, price, and mobilize. Start with an assessment or emergency dispatch via Contact Us. For proactive programs, see Maintenance Plans.