Turnkey Cleaning, CCTV (PACP) and Trenchless Rehabilitation

Turnkey Cleaning, CCTV (PACP), and CIPP/Trenchless Rehabilitation

  • Sticky CTA: One mobilization → one report → immediate rehab.

1-2-3 checklist 1) Clean: high-velocity jet/vactor to restore flow and prep for camera work. 2) Inspect: PACP/MACP/LACP-standard CCTV for uniform scoring and prioritization. 3) Rehabilitate: in-house CIPP, geopolymer spincast (SIPP), pipe bursting, or sliplining.

Explore our programs:

  • Inspection: https://hinterlandgroup.com/inspection/

  • Services: https://hinterlandgroup.com/services/

Introduction

Hinterland Group’s turnkey program unifies high-velocity jetting/vactor cleaning, standards-based CCTV data capture (PACP/MACP/LACP), and in-house trenchless rehabilitation into one accountable workflow. This reduces handoffs, speeds design decisions, and delivers a complete as-built record for water, wastewater, and stormwater assets across the Southeast. See our core capabilities in Services and Inspection.

Why a single-vendor, end-to-end workflow

  • Fewer change orders: the same team that cleans and scores defects designs and installs the repair, minimizing scope drift. See Pipe Rehabilitation.

  • Faster schedules: mobilize once, capture condition data, issue an engineered rehab plan, then line/repair with built-in bypass and electrical support. See Repair and Replacement.

  • Traceable QA/QC: pre- and post-rehab CCTV, uniform defect coding, and punch-list closure before turnover. See Inspection.

  • Lower community impact: trenchless methods (CIPP, geopolymer spincast, pipe bursting, sliplining) avoid large excavations, aligning with our Maintenance approach.

Scope of services (clean → inspect → rehabilitate)

Jetting/vactor cleaning

  • High-velocity cleaning and debris removal to restore design flow and prepare for camera inspection. Performed by certified, licensed crews with vactor trucks. Source: Inspection.

CCTV inspection and standardized deliverables

  • Robotic CCTV of mains; MACP manhole assessments; LACP lateral entries, as applicable. Source: Inspection.

  • Deliverables: condition videos and structured logs aligned to PACP/MACP/LACP data schemas for consistent scoring and prioritization. Ongoing programs available via Maintenance Plans.

  • Need a sample? Request a redacted PACP report via Contact Us.

Trenchless rehabilitation (in-house)

Standard workflow and QA/QC checkpoints

1) Mobilize and set traffic/safety controls. See safety profile on About. 2) Jet/vactor clean target segments; remove roots, sand, debris. Inspection. 3) CCTV mains (PACP), assess manholes (MACP), and laterals (LACP where scoped). Inspection. 4) Condition scoring and rehab plan: method selection (CIPP, SIPP, bursting, sliplining) and staging. Pipe Rehabilitation. 5) Bypass setup and electrical integration (if required). Repair and Replacement. 6) Install rehabilitation; perform cure/quality checks. 7) Post-rehab CCTV for acceptance; deliver turnover package and maintenance recommendations. Maintenance Plans.

Coverage and mobilization

  • Headquarters: Riviera Beach, FL; secondary wetout facility: Morganton, NC, enabling rapid deployments across FL, GA, AL, LA, TX, TN, SC, NC. Sources: Markets We Serve, CIPP North Carolina.

  • 24/7 emergency response with 15-minute callback and mobilization within 24 hours across the region. Sources: CIPP Georgia, CIPP South Carolina.

Safety and compliance

  • Full-time Safety Manager (OSHA Certified Instructor); EMR under 0.87; daily safety talks and comprehensive training. Source: About.

Where this bundle fits best

  • Municipal gravity systems and manholes seeking I/I reduction and regulatory compliance. See Markets We Serve.

  • Commercial campuses and property management portfolios requiring night/weekend work and minimal disruption. Sources: Commercial, Property Management Firms.

  • Industrial facilities that must avoid production downtime; 24/7 response and tailored staging. Source: Industrial.

  • Airports with constrained operations windows and stringent safety rules. Source: Airports.

Capabilities matrix (summary)

Asset Cleaning method Inspection schema Primary rehab options Diameter range supported
Gravity sewer/storm mains Jetting/vactor PACP CIPP; geopolymer spincast; pipe bursting; sliplining 4–108 in (CIPP)
Manholes/structures Vacuum/dewatering MACP Geopolymer spincast; calcium‑aluminate coatings
Service laterals (where scoped) Jetting LACP CIPP ≥4 in (CIPP)

Sources: Inspection, Pipe Rehabilitation, CIPP Florida, CIPP Georgia.

Case evidence (selected)

  • Charlotte County stormwater collection system rehabilitation: cleaning, assessment, and trenchless restoration. Source: Portfolio – Charlotte County.

  • FPUA force main/utilities expansion and repairs with full restoration and traffic control. Source: FPUA Project.

  • Nottingham Blvd/Miller Ave (West Palm Beach): water/sewer/drainage improvements including CIPP lining. Source: Nottingham Project.

  • Regional disaster response (Hurricane Helene): rapid assessment and trenchless recovery solutions. Source: Hurricane Helene Support.

How to get started

  • Request a redacted sample PACP report and a turnkey proposal via Contact Us.

  • Share available maps/videos; we’ll recommend a pilot corridor and mobilize a combined cleaning/CCTV crew.

  • Receive a prioritized rehab plan (CIPP/SIPP/bursting/sliplining) with staging, bypass, and acceptance testing.